Ohme Home Pro - We Power Your Car
We aim for a lead time of 8 to 10 working days. However, we are seeing an increase in demand due to the OZEV grant ending at the end of March. This may increase lead time slightly in certain areas.
We aim to avoid any hidden costs and 'from' pricing.
Finance Options Now Available on Purchases over £1,000 - No Upfront Cost - Call for More Information

Chargers & Accessories

Ohme Home Pro

Introducing the Ohme Home Pro – a compact, one-of-a-kind tethered EV charger with distinct features that have never been seen before. The Ohme Home Pro is the first EV charger to offer an interactive LCD Screen, meaning not only can you control your charger from the trusted Ohme app, but you have the capability to manage your EV charge point from the unit itself!

The Ohme Home Pro also comes with built-in PEN protection, meaning an earth rod isn’t needed, unlike its forerunner – the Ohme Home. The Ohme app also allows you to track your CO2 consumption levels, set maximum price caps on your charging, and offers you the best-real time energy prices, meaning you can select the cheapest available.

Manage your costings, save the planet, and look good whilst you do it with the Ohme Home Pro.

Typical charger & installation cost
Finance This Charger From £26 per month
From £1199
  • Features
    Low Carbon Green Energy Use

    Using the Ohme's 'Green Feature', the Ohme smart charger tracks your CO2 consumption levels so you can be smart when it comes to sustainability. You can also set your Ohme to prioritise charging when the electricity grid is at its cleanest. 

    Save, Save, Save

    The Ohme EV charger can offer you the best-real time energy prices and is compatible with the Octopus Energy Agile tariff. 

    No Earth Rod Needed

    The Ohme Home Pro has a built-in earthing arrangement, which means an Earth Rod (or sometimes named Earth Spike) is not needed, creating a more aesthetically pleasing charger. This is different to the Ohme Home, which did not have built-in PEN protection.

    Different Ways to Charge

    Manage your EV charging by utilising either the Ohme app or the new interactive LCD screen on the unit. You can even see live charge data on the screen.

    2G/3G/4G Multinet Sim Card

    *Mobile connectivity results in a fast and seamless connection to the Ohme app, so you have easy access to a range of special features.

    *The Ohme Home Pro uses a 4G multinet sim card, and Ohme covers the cost of the sim card for the first three years. Please be aware that whilst signal coverage in the UK is generally good, the unit relies on mobile phone connection for the smart features. If the signal is known to be unreliable, please note that the customer should be made aware that the smart features will be unreliable.

    Free Over the Air Software Updates

    The Ohme Home Pro does free over the air software updates, ensuring your charger is automatically upgraded to the latest firmware, benefiting you with new features from the get-go. 

    Ohme App

    Download the free Ohme App and access a range of smart features such as charge scheduling, charge history and live charge data.

  • Specification

    Charging Output: 7.4kW - Single Phase

    Compatibility : Type 2 tethered units only 

    Available Colours: One colour - Black

    Dimensions: H170 x W200 x D100 mm. 

    Weight: 4kg

    Manufacturer Warranty: 3-Year Warranty 

Tethered charger

This type of electric charger has it's own cable to charge your car.

Socketed charger

This type of electric charger requires a seperate cable to charge your car.

Spread over a 60 month period.

Also available over 24, 36 and 48 month periods.

We will contact you to process the credit application. Approval is subject to application, financial circumstances and borrowing history. 12.9% APR representative. T&Cs apply.

Your order is not confirmed until your application has been approved.

Underground cable

We lay SWA cable laid at 600mm deep, with a protective cable warning tape laid 150mm above the cable. These are laid on a sand or sifted sand soil bed then backfilled.

Overhead cable

We position overhead cables at a minimum height of 3.5m and are run along a catenary wire. The cable run should not be accessible to vehicles.

Standard Installation
Our instant price is fixed if it falls within our standard installation package plus any additions that you have selected (extra cabling for example). This package covers the majority of homes in the UK. Before we undertake your installation we will carry out a digital survey to check that nothing has been missed. After reviewing the survey results some additional work may be required in order to complete your installation safely and to the required standards. If this is the case, we will contact you well before the installation date and advise the cost of any required work. You can then continue with your installation, or alternatively we will refund you in full if you do not want to proceed.

Included in our standard installation is :
• Fitting of a single phase charge point to a brick or plaster wall or other suitable permanent structure
• Up to 10 metres of cable, run and neatly clipped to the wall between the electricity supply meter / distribution board and the charge point.
• Routing of the cable through a drilled hole in a wall up to 500mm (20 inches) thick if this is needed.
• The fitting and testing of electrical connections and protections required for the charge point.
• An additional three way consumer unit, if required
• Installation of a Type A RCBO in an RCBO enclosure
• Up to 3 metres of plastic trunking to conceal interior wiring.
• An O-pen earth protection device if the charge point requires it. (This is NOT an earth rod)
• Up to 4 hours of labour from your installer to complete the work.
• Electrical testing of the whole installation.
• Handover and setup of the charge point and any app that may be needed.

Not included in our standard installation (additional work) :
• Where the installation requires additional cabling over and above the amount you have told us about.
• Upgrade/replacement of the main incoming supply fuse where the local DNO (eg Northern Powergrid) would need to attend site.
• If the charge point is to be mounted on a post/pedestal rather than an existing wall and where you have not selected a post as an extra cost option in your order.
• Installation of a charge point to a three phase supply.
• Where gas and water mains bonding (earthing) is not in place at your property. If this is not in place, additional work would be required before installation of the charge point.
• Any groundwork that has not been selected during the order process.

What else you need to know :
• On the day of installation, please ensure that the area around your consumer unit (fuse box), incoming electricity supply meter and proposed charge point location (including where the cable is expected to be run) is clear and free of obstructions.
• We will need your WiFi password as part of the installation process in order to connect your charge point to the internet. Please have this available for the installer. Details will not be kept.
• The charge point must be on your own designated off road parking.
• The charger will be fixed in line with current guidelines at a height where it cannot be hit by a vehicle.
• Our installers are not able to enter loft spaces; lift floorboards or flooring; take apart any furniture of work above a height of 2m. If you anticipate that any of this may be required, then please contact us and we can discuss in more detail and provide you with a quotation.
• Should there be extreme weather conditions our installers may not be able to continue with you installation if it is not safe to do so (for example flooding). They will always do their best to complete the work where they can.

If you have any questions then please contact our customer service team who will be happy to help. Please also read our terms and conditions.